Bridge Rehabilitation Grouping

The goal of this project is to enhance and extend the lifetime of several deteriorated bridges within Miami-Dade County.  This 5 year contract will keep BPA supervising and managing contractors blasting and recoating structural steel beams, repairing concrete spalls on concrete beams, columns and caps; removing and replacing deficient expansion joints and addressing slope pavement cracks on I-95 near the downtown area.  A similar scope has been implemented on bridges over the Intracoastal Waterway, I-95, the Port of Miami and the McArthur Causeway. Additionally this contract will install pile jackets with cathodic protection systems to rehabilitate smaller off-system bridges within the County.  BPA is pleased to serve the FDOT and help lengthen the lifetimes of these bridges within our County.