BPA in a subcontract role was responsible for the Fast-Track development of final contract documents for the Florida Department of Transportation’s widening of this 3016’ long concrete segmental box girder viaduct.  The work consisted of adding 3’-8” to each side of the box girder concrete deck slab, adding bottom longitudinal post-tensioning in 9 spans, and re-striping the bridge for two lanes of traffic. The plans were completed in three months and bid results were within 1% of the estimate.