SR 836 over the Miami River Bridge Assessments

BPA was responsible for developing complete Bridge Painting construction documents for five MDX Expressway bridges. BPA provided bridge coatings assessment reports on 8 bridges for MDX. This project included hands-on inspection of each of the bridge structures, the development of bridge painting technical specifications and plans. In addition, BPA developed contract documents for cleaning and coating all bridges on the five MDX Expressway facilities.

Similar Projects

Bridge Rehabilitation Grouping

Sunshine Skyway Bridge

MDX Bridge Painting and Structural Repair