Sunshine Skyway Bridge

As the protective coatings consultant for ICA (and previously PB Americas), Bolton Perez & Associates provided technical oversight during the surface preparation and painting of the steel cable stays.  BPA previously provided QA inspection for waterproofing of the reconstructed post tensioned column caps.

Similar Projects

Bridge Rehabilitation Grouping

MDX Bridge Painting and Structural Repair

Columbus Swing Bridge