Districtwide Bridge Repair/Rehabilitation Plans Preparation

DW Bridge Repair/Rehabilitation Plans Preparation

Client: FDOT D6

Location: Districtwide

Contract Delivery:  TWO

Services Provided:

  • Bridge Design
  • Roadway Design
  • Traffic Engineering
  • Load Rating
  • Post Design Services

BPA is currently managing the five-year Districtwide Bridge Repair and Rehabilitation Program contract to conduct the design, preparation of contract documents, and other engineering services for improvements to transportation facilities assigned on a task work order (TWO) basis. Contract documents include plans, specifications, supporting engineering analysis, calculations and other technical documents as specified.

Some of the more notable TWO’s assigned under this contract include the rehabilitation of the following bridges: SR 5/US-1 over Cow Key Channel Bridges 900086 & 900125, which uses FSBs in a State Road, GFRP rebar and CFRP strands; SR 994/Quail Roost Drive over Canal C-102 Bridge 870628, which uses UHPC; and SR 112/I-195 over Westshore Waterway Bridge 870314, which uses GFRP rebar for repairs and pile jackets.

Portfolio