SR 80 / Southern Blvd. Bridge Replacement

SR 80 / Southern Blvd. Bridge Replacement

Client: FDOT D4

Location: Palm Beach County, FL

Services Provided:

  • Post-Design Services

The Southern Blvd. Bridge replacement project includes the replacement of a movable bridge over the Atlantic Intracoastal Waterway (AICWW) and replacement of a low level fixed bridge over Lake Worth Lagoon, a tide relief canal. The project encompasses approximately 0.5 miles of urban roadway reconstruction, as well as upgrades to the Post Memorial Causeway, and a temporary bridge built north of the existing bridge to maintain traffic while the replacement bascule bridge is under construction.

Key BPA team members have been involved in the project since its inception during the PD&E Phase, through the Final Design Phase and are now providing post design services and construction support. Construction completion is expected for early 2021.

Portfolio